NEW QUESTION 48
A customer complaint to be recorded in the following ways (more than one answer is true):

  • A. You create a notification with reference to an SD document.
  • B. The "quality assurance" department is notified using the SAP Business Workflow
  • C. You enter a general description of the problem and save the notification.
  • D. You create a notification with reference to a purchase document.

Answer: A,B

 

NEW QUESTION 49
Which statement is correct?

  • A. You make the settings for the QM control key in Customizing under Quality Management -> QM in Logistics -> Define Control Keys -> QM in Procurement.
  • B. You make the settings for the QM control key in Customizing under Quality Management -> QM in Logistics -> QM in Procurement -> Define Control Keys.

Answer: B

 

NEW QUESTION 50
The physical-sample records are either created automatically at inspection lot creation or manually.

  • A. Correct
  • B. Incorrect

Answer: A

 

NEW QUESTION 51
You can transfer data from the internal problem notification to the external notification

  • A. Correct
  • B. Incorrect

Answer: A

 

NEW QUESTION 52
Which of the following does the system automatically do when you complete a stability? Correct 3

  • A. Set the system status to completed
  • B. Lock all the storage conditions
  • C. Trigger a subsequent stability Study
  • D. Lock the test schedule
  • E. Set the usage decision for all stability inspection lots

Answer: A,B,D

 

NEW QUESTION 53
Which statements are correct? (More than one answers are true)

  • A. A valuation may be in recorded for every question in the question list.
  • B. Several question lists can be assigned to one audit.
  • C. A document may be assigned to every audit data object.
  • D. None

Answer: A,C

 

NEW QUESTION 54
You can also call the context-sensitive SAP Library using the F1 key.

  • A. Correct
  • B. Incorrect

Answer: A

Explanation:
Explanation/Reference:

 

NEW QUESTION 55
From which tables does quality management information system (QMIS) retrieve data?

  • A. Control charts
  • B. Structure figures
  • C. Early warning processes
  • D. Info structure

Answer: D

 

NEW QUESTION 56
Which statements are correct? (More than one answer is true.)

  • A. Each inspection is identified by an inspection point.
  • B. In Customizing, you can define a maximum of 8 fields to identify the inspection point.
  • C. An inspection point contains the total quantity of all characteristics that are to be inspected for an operation, based on a partial quantity or a time interval.
  • D. You can record inspection results for an inspection lot, using defect data or characteristic results.

Answer: A,C

 

NEW QUESTION 57
What is required in inspection planning to transfer a characteristic value from results recording of inspection lot processing

  • A. Configuration settings
  • B. Usage of the class characteristics in the task list
  • C. Master inspection characteristic linked to class characteristics
  • D. Settings for the inspection type activated in the material level

Answer: C

 

NEW QUESTION 58
You must assign a certification profile for outgoing certificates to key combination What key combination that require no adjustment does SAP QM prove

  • A. Material , Customer, Material group
  • B. Customer, Material, Material group
  • C. Material /Customer, Material Material type
  • D. Material /Customer, Material Material group

Answer: A

 

NEW QUESTION 59
On the basis of the vendor or manufacturer quality information stored for a particular material, the purchasing department can draw on quality-related information in addition to the standard criteria (price, and so on) when selection a vendor.

  • A. Correct
  • B. Incorrect

Answer: A

 

NEW QUESTION 60
The dynamic modification rule defines the inspection stages and the conditions for an inspection stage change.

  • A. Correct
  • B. Incorrect

Answer: A

 

NEW QUESTION 61
Process-optimized results recording enable flexible tabular characteristic processing.

  • A. Correct
  • B. Incorrect

Answer: A

 

NEW QUESTION 62
Your customer wants to periodically calibrate the quality management test equipment used in an inspection plan . Which type of test equipment must used ?

  • A. Documents
  • B. Materials
  • C. Production resource/ tools PRTs
  • D. Equipment

Answer: D

 

NEW QUESTION 63
The call object for scheduling in stability studies is the inspection Group.

  • A. Incorrect
  • B. Correct

Answer: A

 

NEW QUESTION 64
The system assigns an active inspection type during inspection lot creation Where can the system choose the inspection type? Note : 3 correct answer

Answer:

Explanation:
From the material specification
>/ From the Preferred inspection type in material master
\/ From the Quality level
From the Quality info Record
>/ From the inspection type assigned to an order type
B, C, E

 

NEW QUESTION 65
When you plan an audit for which component can you define partners? (2 correct Ans)

  • A. Audit
  • B. Audit Question
  • C. CAPA
  • D. Question

Answer: A,C

 

NEW QUESTION 66
......


SAP C-TPLM40-65 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Implement & Configure Quality Planning 8% - 12%

Explain the configuration requirements of Quality Planning

Quality Certificates < 8%

Describe the purpose and features of Quality Certificates

Integration of QM with S&D and Service < 8%

Describe how QM integrates with Sales and Service

Sample Management < 8%

Describe the purpose and features of Sample Management.

Quality Notifications < 8%

Describe the purpose and features of Quality Notifications

Audit Management < 8%

Describe the process of Audit Management

QM in Process Industries < 8%

Describe the QM business processes used in Process Industries


 