[Nov 30, 2021] Ultimate DES-6322 Guide to Prepare Free Latest EMC Practice Tests Dumps
Get Top-Rated EMC DES-6322 Exam Dumps Now
EMC DES-6322 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
| Topic 9 |
|
| Topic 10 |
|
| Topic 11 |
|
Dell EMC VxRail Specialist Exam Certification Details:
| Exam Code | DES-6322 |
| Sample Questions | Dell EMC VxRail Specialist Sample Questions |
| Number of Questions | 60 |
| Exam Name | Dell EMC Certified Specialist - Implementation Engineer - VxRail (DCS-IE) |
| Passing Score | 63% |
| Duration | 90 mins |
| Schedule Exam | Pearson VUE |
| Books / Training | VxRail Appliance 7.0.XXX Concepts - ES101CPX02007 - On Demand VxRail 7.0.XXX Feature - REST API - ES102CPX02009 - On Demand VxRail Installation and Implementation - ES524CPX00074 - Classroom/Virtual Classroom VxRail 7.0.XXX Installation and Implementation - ES502CPX02031 - On Demand |
| Exam Price | $200 (USD) |
NEW QUESTION 61
Use the VxRail simulator to explore the system. What is the presented configuration?
Note: It fs necessary to close (x) the simulator window before you can select a response to this question.




- A. Internal vCenter and external DNS
- B. External vCenter and external DNS
- C. Internal vCenter and Internal DNS
- D. External vCenter and internal DNS
Answer: A
NEW QUESTION 62
An implementation engineer places a VxRail node into maintenance mode using the Ensure accessibility setting What is the engineer likely planning to do?
- A. Extensive maintenance
- B. Temporary maintenance
- C. Permanent removal of host from cluster
- D. Shutdown of an entire cluster
Answer: A
NEW QUESTION 63
In a VxRail Stretched Cluster deployment of 8 nodes on between sites?
- A. Primary to Witness site RTT: < 200 ms Secondary to Witness site RTT: < 200 ms Primary to Secondary site RTT: <: 5 ms
- B. Primary to Witness site RTT: < 200 ms Secondary to Witness site RTT < 200 ms Primary to Secondary site RTT: < 10 ms
- C. Primary to Witness site RTT: < 250 ms Secondary to Witness site RTT; < 250 ms Primary to Secondary site RTT: < 5 ms
- D. Primary to Witness site RTT: < 150 ms Secondary to Witness site RTT: < 150 ms Primary to Secondary site RTT: < 10 ms
Answer: D
NEW QUESTION 64
What is the maximum number of supported nodes for a VxRail cluster running on a 1 GbE network?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: B
NEW QUESTION 65
A planned VxRail Stretched Cluster will have four hybrid nodes at each site. What is the recommended storage policy to ensure cross-site and local protection, using storage as efficiently as possible?
- A. Site disaster tolerance - Dual site mirroring (stretched cluster)
Failures to tolerate - No data redundancy - B. Site disaster tolerance - Dual site mirroring (stretched cluster)
Failures to tolerate - 1 failure - RAID-5 (Erasure Coding) - C. Site disaster tolerance - None keep data on Preferred (stretched cluster) Failures to tolerate - 1 failure - RAID-1 (Mirroring)
- D. Site disaster tolerance - Dual site mirroring (stretched cluster)
Failures to tolerate - 1 failure - RAID-1 (Mirroring)
Answer: B
NEW QUESTION 66
Match each component of the VxRail HCI System Software to its description.
Answer:
Explanation:
NEW QUESTION 67
What setting is used for the object space reservation in the VXRAIL-SYSTEM-STORAGE-PROFILE?
- A. 50% Reservation
- B. 75% Reservation
- C. Thick Provisioning
- D. Thin Provisioning
Answer: D
NEW QUESTION 68
After implementation, the implementation engineer observes errors from both VxRail Manager and vCenter Server. Dell EMC support has requested a log bundle containing only the required log files. Using the simulator, create and download a log bundle for Dell EMC support.
When you have finished, continue to the next question.





Answer:
Explanation:
Pending
Send your suggestions for this question.
NEW QUESTION 69
A VxRail implementation engineer is validating the network environment with NVT. The proposed switch configuration is shown in the exhibit. The ToR Switch information file is available.
Use the VxRail simulator to set up NVT for switch validation. Import the switch Information and tag the ports based on the exhibit.
Answer:
Explanation:
NEW QUESTION 70
From what location should NVT for VxRail be run?
- A. VxRail network Top of Rack switch
- B. Jump server on a different network
- C. Laptop connected to the first VxRail ESXi node
- D. Workstation on the same network as VxRail Manager
Answer: C
NEW QUESTION 71
Once a VxRail cluster has been acquired, what is the correct sequence of steps to deploy it?
Answer:
Explanation:
NEW QUESTION 72
A VxRail Cluster has just been deployed. Use the VxRail simulator to determine the Service Tag, Model, and ESXJ IP Address of the first node - vcluster730.esx01.edu.local.
Note: It is necessary to dose (x) the simulator window before you can select a response to this question.






- A. Option D
- B. Option B
- C. Option A
- D. Option C
Answer: A
NEW QUESTION 73
What is a valid 2-node VxRail cluster configuration?
- A. 2x 1 GbE and 2x 10 GbE in a switch configuration and internal vCenter
- B. 2x 10 GbE and 2x 25 GbE in a switch configuration and external vCenter
- C. 2x 1 GbE and 2x 10 GbE in a direct-connect configuration and external vCenter
- D. 2x 10 GbE and 2x 25 GbE in a direct-connect configuration and internal vCenter
Answer: C
NEW QUESTION 74
A VxRail Manager VM must be configured as follows:
* IP address: 192 168.10.16
* Net mask: 255.255.255.0
* Gateway: 192 168 10 254
Which command must be used?
- A. vxrail-network -config --vxrail-address 192.166 10 16 --vxrail-netmask 255 255.255 0 --vxrail-gateway
192.168.10.254 - B. vxrail-prrmary -config --ip 192 168 10 16 -netmask 255 255 255 0 -gateway 192 168 10 254
- C. vxrail-primary -config --vxrail-address 192.168.10 16 --vxrail-netmask 255 255 255 0 -vxrail-gateway
192.168,10 254 - D. vxrail-network-config --ip 192 168 10.16-netmask 255.255.255.0-gateway 192 168 10.254
Answer: C
NEW QUESTION 75
Match each component of the VxRail HCI System Software to its description.
Answer:
Explanation:
NEW QUESTION 76
An implementation engineer is expanding an existing VxRail E Series cluster with an additional node The version of the node is not at the current cluster level and is not compatible What action must be performed before adding the node?
- A. Compute node expansion
- B. RASR Factory Image Upgrade
- C. Order node with correct image
- D. RASR Factory Reset
Answer: C
NEW QUESTION 77
An implementation engineer is logged into the vSphere Client of a recently deployed VxRail cluster They want to review the versions of all the installed VxRail software components.
Which view should they use to gather this information?
- A. Menu > Administration > Solutions > Client Plugins
- B. Host and Clusters > VxRail Cluster > Configure > VxRail > Updates
- C. Host and Clusters > VxRail Cluster > Configure > VxRail > System
- D. Hosts and Clusters > VxRail Cluster > Monitor > VxRail > Appliances
Answer: B
NEW QUESTION 78
What is a benefit of using the VxRail REST API?
- A. Programmatically gather VxRail system health
- B. Remote upgrades of iDRAC related software only
- C. Automated security audits of VxRail clusters
- D. Polling for vSAN performance statistics
Answer: A
NEW QUESTION 79
A VxRail solution will be deployed with the embedded vCenter and an external DNS At a minimum, for which components must DNS records be created?
- A. vCenter Server Platform Services Controller, and iDRAC
- B. ESXi Hosts, VxRail Manager and iDRAC
- C. vCenter Server, ESXi hosts, and VxRail Manager
- D. vCenter Server Platform Services Controller, and VxRail Manager
Answer: D
NEW QUESTION 80
A customer has decided that they will be using the Spanning Tree protocol in their Dell EMC ToR switches How should the switch ports used for VxRail be configured to achieve a successful deployment?
- A. Enable link aggregation for all ports
- B. Set the port mode to access
- C. Set the port type to edge
- D. Enable MLD snooping and querier
Answer: C
NEW QUESTION 81
What is a consideration when adding nodes to a VxRail G Series chassis?
- A. G560 and G410 nodes are permitted in the same chassis
- B. In a full G Series chassis, all nodes must have 10GbE ports
- C. All nodes in a G Series chassis must be identical
- D. Hybrid and All-Flash nodes are permitted, if in different chassis
Answer: C
NEW QUESTION 82
......
Passing Key To Getting DES-6322 Certified Exam Engine PDF: https://www.vcedumps.com/DES-6322-examcollection.html
DES-6322 Exam Dumps Pass with Updated Tests Dumps: https://drive.google.com/open?id=1tM_ui7LIpJAKQjBBammX8clUyTxHkd9q
